Skip to main content

One Residences At Sobha One World Ph2 W3 and 4, Hoskote

In brief

ONE RESIDENCES AT SOBHA ONE WORLD Ph2 W3 and 4 is a 530-flat Sobha Limited project at Hoskote with 1, 2 and 3 BHK homes; RERA completion is 30 November 2032.

Developer: Sobha Limited

  • Registered on8 May 2026

Facts verified Raaghav Valekar profile photoRaaghav Valekar18 min read

Key takeaways

  • ONE RESIDENCES AT SOBHA ONE WORLD Ph2 W3 and 4 is one of six Karnataka RERA registrations that make up Sobha One World on Old Madras Road, Hoskote, with 530 flats in two 46-floor wings (Wings 3 and 4).
  • Our record lists 90 one-bedroom, 174 two-bedroom and 266 three-bedroom homes with carpet areas of 432.23, 648.31 and 960.01 sq ft.
  • Sobha's township page shows "Starting from INR 1.65 Cr" and no rate, so BestProp estimates about ₹14,700 to ₹15,500 per sq ft of super built-up area on 18 October 2026, with medium confidence and a real quote that will differ.
  • RERA completion is 30 November 2032, and the registration is dated 8 May 2026.
  • Sobha's own site and the portals describe 2, 3 and 4 BHK homes and 3,484 units for the whole township, which does not match this registration, so the unit mix needs confirming with Sobha.

Project at a glance

City

Bengaluru

Project type

Residential/​Group Housing

Project Status

New project launchRERA-registered

Project approved by

Satellite Town Ring Road Planning Authority, plan STRRPA/​TP/​CC/​652/​2025-​26/​318

Total Land Area

255,147 sq ft (about 5.86 acres) on the RERA recordSobha's township page gives 48 acres and 15.32 guntas for all six phases

Address

Hosakote, Bengaluru Rural (Old Madras Road, Hoskote)

Total Units

530 flats: 265 in Wing 3 and 265 in Wing 4

Floors

46 floors

No of Towers/Blocks

2 wings (Wing 3 and Wing 4)

Nearest landmark

Hosakote, Bengaluru Rural

Expected Launch Date

18 August 2026 (project start date on the RERA record)

Developer Track Record

Our staged Karnataka RERA data holds 54 Sobha Limited registrations approved between 24 August 2017 and 8 May 2026, 6 with a completion date before 18 October 2026 and none with an extension on record (data of 28 August 2026)

Possession Date

30 November 2032

Amenities

Electricity, CCTV Surveillance, Club House, Outdoor Sports facility, Swimming Pool, Parks, Power Backup, Water and Sanitation