One Residences At Sobha One World Phase Six Wings Twelve, Thirteen and Fourteen

In brief

One Residences at Sobha One World Phase Six Wings Twelve, Thirteen and Fourteen has 721 Sobha Limited homes at Hosakote, with RERA possession on 31 August 2032.

Developer: SOBHA LIMITED

  • Registered on8 May 2026

Facts verified Raaghav Valekar profile photoRaaghav Valekar19 min read

Key takeaways

  • One Residences at Sobha One World Phase Six is a Sobha Limited registration of 721 apartments in Wings 12, 13 and 14 at Hosakote (Hoskote on the portals we checked), on Old Madras Road, with 47 floors and three basements.
  • The RERA record lists 89 one-bedroom, 270 two-bedroom and 362 three-bedroom homes, which work out to average carpet areas of 432.25, 680.56 and 960.04 sq ft, and sets possession for 31 August 2032, the same date Sobha's own project page gives.
  • Sobha has not published a rate or cost sheet we could find, so BestProp estimates about ₹13,500 to ₹16,500 per sq ft of saleable area on 18 October 2026 (medium confidence); the real quote will differ.
  • Portals describe the whole township as 1 to 4 BHK, but this registration has no 4 BHK.

Project at a glance

City

Bengaluru

Project type

Residential/​Group Housing

Project Status

New Project Launch

Project approved by

Satellite Town Ring Road Planning Authority (plan STRRPA/​TP/​CC/​652/​2025-​26/​318)

Total Land Area

About 8.18 acres (356,522 sq ft), from our project record citing the K-RERA project page

Address

Hosakote, Bengaluru Rural

Total Units

721 units: Wing 12 has 271, Wing 13 has 271 and Wing 14 has 179

Floors

47 floors

No of Towers/Blocks

3 wings (Wing 12, Wing 13 and Wing 14)

Nearest landmark

Hosakote, Bengaluru Rural

Expected Launch Date

1 June 2026 (project start date in our approved figures)

Developer Track Record

Our Karnataka RERA data (last updated 28 August 2026) lists 54 registrations for SOBHA LIMITED, 49 of them approved and 5 withdrawn. It also lists 222 complaints against the promoter, dated 17 February 2019 to 15 July 2026, none naming this project.

Possession Date

31 August 2032

Amenities

Electricity, CCTV Surveillance, Club House, Outdoor Sports facility, Swimming Pool, Parks, Power Backup, Water and Sanitation