Skip to main content

A B Anantha Kammasandra: 2 and 3 BHK Due January 2027

In brief

A B Anantha is a 32-home, single-tower 2 and 3 BHK project by Amaravathi Builders in Kammasandra, Electronic City, with RERA possession of 15 January 2027.

Developer: Amaravathi Builders

  • Project statusOngoing
  • Total units32 units
  • Towers1 tower
  • Registered on10 Sept 2025

Facts verified Raaghav Valekar profile photoRaaghav Valekar17 min read

Key takeaways

  • A B Anantha is a single-tower project of 32 homes on 0.39 acres in Kammasandra, near Electronic City in Bengaluru. It has 8 two-bedroom homes of 695.04 to 812.02 sq ft carpet area and 24 three-bedroom homes of 862.09 to 1,075.02 sq ft.
  • Amaravathi Builders' website shows 2 BHK from ₹87 lakh and 3 BHK from ₹1.14 crore onwards, with no cost sheet (checked 11 October 2026), and Square Yards lists lower indicative prices from ₹79.80 lakh. The K-RERA record gives possession as 15 January 2027.
  • Our amenity research lists a swimming pool, gym and indoor games, but the K-RERA record marks the pool, gym and indoor sports facility as not applicable, so ask which will be built.

Project at a glance

City

Bengaluru

Project type

Residential/​Group Housing

Project approved by

Anekal Planning Authority, approved plan number APA/CC/726/2023-24 (K-RERA record)

Total Land Area

0.39 acres (about 16,988 sq ft)

Address

Kammasandra Village, Anekal Taluk, Bengaluru Urban

No of Floors

G+3 floors

Nearest landmark

Kammasandra, Electronic City, 1.2 km to Hebbagodi Metro, Bengaluru 560100

Expected Launch Date

10 September 2025 in our research (the K-RERA approval date)Square Yards gives 3 January 2025 (checked 11 October 2026).

Developer Track Record

Amaravathi Builders is registered as a proprietorship. In our Karnataka RERA data (last updated 28 August 2026) this is its only registered projectthe builder's website says it has completed 6 projects since 2018 (checked 11 October 2026), which we have not verified.

Possession Date

15 January 2027

Amenities

Swimming pool, gym, indoor games, sewage treatment, 24/7 water supply, rainwater harvesting and groundwater recharge

Parking / Utilities

K-RERA records 32 parking spaces under a stilt floor and a borewell as the water source. Stamp duty is 5% of market value plus applicable surcharge or additional dutyregistration fee is 2%.

Connectivity Snapshot

Road distances: Delta Electronics Bommasandra metro station 3.7 km, Infosys Foundation Konappana Agrahara metro station 4.2 km, Biocon Hebbagodi metro station 5.3 km.

Everyday Convenience

Vishal Mega Mart is 459 m away (saved map data) and M5 ECity Mall is 2.2 km by road.

Project Character

A compact 32-home format with 2 BHK and 3 BHK configurations.